Power distribution network
always suffers from insufficient spans, over-pond routing, etc. due to the fact
that the supply line is too long, the line has to cross the residential area
largely and the selected pole type is designed relatively low; in addition,
illegal activities repeatedly emerge, such as building houses or planting trees
under the lines; in that case, the power supply departments have been placed
under great safety risks, therefore, the contradictions and disputes arising
therefrom have caused impact to the normal operation of the power supply
departments. The contradictions between line and tree, line and house, line and
road as well as line and pond have become the top “long-standing” problems to
the power supply departments. All the above safety risks can be avoided
entirely as long as the renovation of insulation is implemented.The
operation with robot is far more efficient than the traditional insulation
renovation.
Currently, our coating robot has been used in power grid companies in Shandong, Xinjiang, etc. with good effect achieved. Our coating robot has brought changes to the traditional method used for “insulation renovation” by power grid companies and made it possible for operators to carry out insulation renovation to naked wires on the ground, which effectively solved the problems including high labor intensity in manual operation, long shut-down time and high renovation difficulties.